The EU MRV report at company level and the flow of the four electronic templates (EU Regulation 2023/2449)

The report at company level brings the ship reports together. It does not, however, simply add up each ship’s total emissions. The figures it adds have gone through seven steps for the EU ETS, and they cover only the period for which the company was responsible.
Commission Implementing Regulation 2023/2449 set the template for this report for the first time. It also reset the templates for the monitoring plan, the emissions report and the document of compliance. It applies from 1 January 2024 and repeals the old Implementing Regulation 2016/1927 with effect from the same date (Articles 5 and 6).
Scope: this article covers an EU regional regime. Regulation 2015/757 applies to voyages to or from a port under a Member State’s jurisdiction and to emissions within those ports. It covers ships of 5,000 GT and above carrying cargo or passengers for commercial purposes. From 1 January 2025 it also covers general cargo ships and offshore ships of 400 GT and above but below 5,000 GT, and offshore ships of 5,000 GT and above (Article 2). It is not a universal obligation.
The reporting deadline and the validity of the document of compliance are covered in the EU MRV reporting article. This article looks at the templates and the flow.
Five documents come from four templates in Thetis MRV
Articles 1 to 4 of the Implementing Regulation read almost alike. Each template is an electronic template inside Thetis MRV, the system operated by EMSA.
companies shall use the electronic version of the template available in Thetis MRV
Only the document of compliance has a different subject. Under Article 3 the verifier provides the data using the template in the same system. The emissions report and the partial emissions report share one template (Article 2).
| Document | Template | Filled in by | Goes to | Deadline |
|---|---|---|---|---|
| Monitoring plan | Annex I | Company | Assessed by the verifier, approved by the administering authority | See the next section |
| Emissions report | Annex II | Company | Administering authority, flag State of Member State ships, Commission | 31 March each year |
| Partial emissions report | Annex II | Previous company | The same three and the new company | Within three months of the change |
| Document of compliance | Annex III | Verifier | Carried on board | On board by 30 June of the following year |
| Report at company level | Annex IV | Company | Administering authority | 31 March each year |
Note the difference in recipients. The emissions report goes to three places, while the report at company level goes only to the administering authority (Article 11a(2) of Regulation 2015/757). The authority can bring both deadlines forward, but not earlier than 28 February.
A new ship’s monitoring plan runs on two, three and four months
Article 6 of Regulation 2015/757 has three deadlines counted from the first port call.
| After the first call | Basis | What happens |
|---|---|---|
| Within two months | Article 6(2) | The company submits the monitoring plan to the verifier |
| Within three months | Article 6(7) | The company submits a conforming plan to the administering authority |
| Within four months | Article 6(8) | The authority approves it (ships newly within the ETS scope) |
The first two are written as without undue delay and no later than. If the company uses the full two months, the verifier’s assessment has one month left. Paragraph 7 applies to ships first within scope after 1 January 2024. Ships already in scope had to submit a plan reflecting CH₄ and N₂O to the authority by 1 April 2024 (paragraph 6), and the authority’s approval deadline was 6 June 2025 (paragraph 8).
The monitoring plan template has six Parts
Annex I sets out the items of Article 6(3) of the Regulation as tables. The cells the ship has to prepare answers for are mainly in Parts C and D.
| Part | Content | Cells to look at |
|---|---|---|
| A | Revision record | The system assigns the status, separating verifier assessment, submission and approval |
| B | Ship, company, sources | Table B.3 sources and fuels, Table B.4 emission factors, Table B.5 slippage coefficient |
| C | Activity data | Table C.1 Article 9(2) exemption, Table C.3 list of voyages, Table C.5 cargo |
| D | Data gaps | The back-up method in Table D.1 must differ from the method chosen in Table C.2 |
| E | Management | Regular check, data flow, risk assessment, IT, internal review, corrections, outsourcing, documentation |
| F | Further information | Definitions and abbreviations |
The procedure cells do not have to be rewritten from scratch. Recital (5) lets the company refer to procedures already in place under the ISM Code or the SEEMP and give only a brief description or summary.
The route for changing a monitoring plan depends on the reason
The company checks at least once a year whether the plan matches the ship (Article 7(1)). The following reasons require a change. Proposals are notified to the verifier without undue delay (Article 7(3)).
| Reason under Article 7(2) | Verifier assessment | Authority approval |
|---|---|---|
| (a) Change of company | Not covered by paragraph 4 | Required |
| (b) New emission source or new fuel | Required | Required |
| (c) Change in data availability affecting accuracy, for example new measuring equipment | Required | Required |
| (d) Data from the method found to be incorrect | Required | Required |
| (e) Correction of a non-conformity found by the verifier | Assessment under Article 13(1) | Not covered by paragraph 5 |
For (b) to (d) the order is fixed. The company submits the modified plan to the authority after the verifier has notified that it is in conformity (Article 7(4)).
The emissions report carries two sets of totals, Part D and Part E
Annex II has five Parts. A is the ship and company, B is verification, and C is the monitoring method and uncertainty. The figures are in D and E.
Part D holds the annual results under Article 10 of the Regulation: total emissions within MRV scope, distance, time, transport work and energy efficiency. Part E holds the result of Article 10, point (k), which is the figure to report for the ETS. Even from the same voyages, the two totals are not the same number.
The order of the Part E calculation is set by Part C of Annex II to Regulation 2015/757. Only the applicable steps are applied, in order.
| Step | What happens | Emissions report Part E | Company report Part C |
|---|---|---|---|
| 1.1 | Calculate with the formulae in Part A of Annex I | Item 6 | Item 1 |
| 1.2 | Apply the CO₂ emission factor derogation for biofuels and similar fuels | Item 7 | Item 2 |
| 1.3 | Multiply by 50% for voyages between a Member State port and an outside port | Item 8 | Item 3 |
| 1.4 | Multiply by zero the CO₂ under Article 12(3a) and (3b) of the ETS Directive | Item 9 | Item 4 |
| 1.5 | Multiply by zero the emissions under Article 12(3-d), (3-c) and (3-b) of the ETS Directive | Item 10 | Item 5 |
| 1.6 | Deduct 5% where the company uses the ice-class derogation | Item 11 | Item 6 |
| 1.7 | Apply the phase-in percentages for reporting years 2024 and 2025 | Item 12 | Item 7 |
Each item in Part C of the report at company level is the sum across ships. Items 5 to 7 are grouped separately for submission to the Union Registry, for the reason given in recital (12).
A hypothetical case follows the company total
The figures below are invented for illustration and are not real ship data. Company X managed ship A throughout reporting year 2025 and sold ship B on 30 June. Steps 1.2, 1.4, 1.5 and 1.6 are assumed not to apply. The 70% for 2025 comes from Article 3gb of the ETS Directive. The unit is tonnes of CO₂ equivalent.
| Value | Ship A | Ship B (Company X period) | Company X total | Cell |
|---|---|---|---|---|
| Between Member State ports and within port | 6,000 | 1,000 | ||
| Between a Member State port and an outside port | 20,000 | 8,000 | ||
| Step 1.1 | 26,000 | 9,000 | 35,000 | Part C item 1 |
| Step 1.3 | 16,000 | 5,000 | 21,000 | Part C item 3 |
| Step 1.7 | 11,200 | 3,500 | 14,700 | Part C item 7 |
Ship B’s figures come from Company X’s partial emissions report, because Article 11a(1) bases the company figures on the emissions reports and the partial emissions reports. As the previous company, X files the partial report within three months of the change, which here is by 30 September. The new company is among the recipients.
Item 8 of Part A of Company X’s report lists both ships, each with its period of responsibility. The new company’s report also lists ship B, with the period from 1 July, because Part C of Annex II ties the ETS figures to the period under that company’s responsibility.
Only ships within the scope of the ETS Directive go on this list (Annex IV, Part A, item 8). A ship within MRV but outside the ETS is not in the total. Annex I to the ETS Directive excludes the activities under Article 2(1a) of Regulation 2015/757, and excludes those under Article 2(1b) until 31 December 2026.
From reporting year 2026 there is no step 1.7 percentage. Under Annex I to the ETS Directive, CH₄ and N₂O also enter the ETS figures from 1 January 2026.
The verifier does not re-verify ship reports in the company report
The report at company level is verified too. Where the verifier concludes with reasonable assurance that it is free from material misstatements, it is verified as satisfactory (Article 13(5)). What is examined differs, though. Article 14(4) looks at the completeness of the reported data and its consistency with the verified emissions reports and partial emissions reports. Article 15(6) says the ship reports are not verified again at this stage.
That creates an order. The company total cannot be final until the ship reports have been verified. Yet both documents share the same deadline, and under an authority that brings it forward the time shrinks to 28 February.
Part D of Annex IV is where the company describes its aggregation method and changes from the previous period. In item 2 of Part A the company selects whether it is the shipowner or an ISM company distinct from the shipowner.
Worth confirming
This article covers Implementing Regulation 2023/2449, the consolidated text of Regulation 2015/757 of 1 January 2024, and Article 3gb and Annex I of ETS Directive 2003/87 only.
Some things are not covered here. The detailed rules on monitoring, reporting and verifying company figures are in the delegated acts under Articles 11a(4) and 13(6). The rules on approval of monitoring plans are in the delegated acts under Article 6(8). The screens and account steps of Thetis MRV are not covered. Which period the new company’s annual emissions report covers in the year of a change is not settled here from the wording of these documents alone. Confirm it with the administering authority’s guidance.
Whether the administering authority has brought the deadline forward, and whether there are amendments after the consolidated text, is checked with the authority and on the EUR-Lex document page.
You can consult the cited source documents
These links lead to the official publishers of the documents discussed here. Match the edition and provisions cited in the article; for EU legislation, also consult the consolidated versions and amendment history on the document page.
Continue with the related operational guidance
Bellbook is an operations platform for shipping companies: planned maintenance and certificates, audit prep, crew HR and payroll, and voyage reporting in one place.
Start for freeRelated reading
- The order of EU MRV verification, the 5% materiality level and what the ship prepares (EU Regulation 2016/2072)Environment and regulation
- What each ship type records as cargo carried per voyage under EU MRV (EU Regulation 2016/1928)Environment and regulation
- The EU MRV reporting deadline and the 18-month document of compliance that meets it (EU Regulation 2015/757)Environment and regulation