Type approval tests, response times and 18-month records for 15 ppm bilge separators and alarms (MEPC.107(49))

Resolution MEPC.107(49), adopted on 18 July 2003, is the set of Guidelines for the pollution prevention equipment that handles machinery space bilges. It covers design, installation, performance and testing. When a ship may discharge is set by MARPOL Annex I regulation 15, and what is written down is set by the Oil Record Book. This article looks at neither of those. It looks at the equipment itself.

There are four questions. Which ships’ equipment the Guidelines reach, what was passed in the type approval tests, how the alarm and automatic stop have to behave, and which records and documents have to stay on board.

The Guidelines treat three devices as one set

Paragraph 3.1 divides pollution prevention equipment into three. The 15 ppm Bilge Separator, the 15 ppm Bilge Alarm and the automatic stopping device.

A separator may be any combination of a separator, filter, coalescer or other means, or a single unit (3.2). The automatic stopping device is a valve arrangement in the separator’s effluent line. When the oil content exceeds 15 ppm, it sends the effluent back to the bilges or a bilge tank instead of overboard (3.6). Here ppm means parts of oil per million parts of water by volume (3.4).

The regulation numbers in the Guidelines are the old ones. The regulation 16 they cite corresponds to the oil filtering equipment of regulation 14 in Annex I as revised by MEPC.117(52). Regulation 14.6 requires the 15 ppm performance, and regulation 14.7 requires the alarm and automatic stop. Ships of 10,000 gross tonnage and above come under regulation 14.7. Ships of 400 gross tonnage and above but below 10,000 come under regulation 14.6, and those that may discharge ballast water retained in fuel oil tanks must also meet regulation 14.2 (regulations 14.1 and 14.2).

The applicable standard divides at 1 January 2005

Paragraph 1.3 looks at when the ship was built and when the equipment was fitted.

Ship and installation Standard
Keel laid or at a similar stage of construction on or after 1 January 2005 MEPC.107(49)
New installation from that date on a ship built earlier MEPC.107(49), so far as reasonable and practicable
Existing installation on a ship built earlier A.393(X) (installed on or after 14 November 1978), MEPC.60(33) (installed on or after 30 April 1994), or these Guidelines

High capacity separating equipment for effluent from tankers’ cargo tanks does not have to be tested under these specifications (1.1.2). The tests here have bilge water and ballast water from fuel oil tanks in mind (1.1.1).

A separator passes three test fluids at its design throughput

Part 1 of the annex has one standard. Whatever the oil content of the feed, the effluent must contain no more than 15 ppm (1.2.1). Tests run at the full design throughput (1.2.3). The test rig includes pumps, valves and pipes as well as the separator (1.2.2).

Test Fluid Content Test
A Residual fuel oil RMG 35, density at 15°C not less than 980 kg/m3 5,000 to 10,000 ppm mixture, 25% mixture, 100% Test Fluid, water only, continuous automatic run of at least 2 hours (1.2.9)
B Distillate fuel oil DMA, density at 15°C not less than 830 kg/m3 5,000 to 10,000 ppm mixture, 25% mixture (1.2.10)
C An emulsion. Per 1 kg, 947.8 g fresh water, 25.0 g each of Test Fluids A and B, 0.5 g surfactant, 1.7 g iron oxides 6% Test Fluid C and 94% water, giving 3,000 ppm emulsified oil, for 2.5 hours (1.2.11)

The continuous run with Test Fluid A cycles from water to a 25% mixture and back every 15 minutes. At the end of an efficiency test, an air cock on the pump suction side is opened and the effluent is sampled as the flow ceases. Paragraph 4.1.4 says that a change of feed to oil, emulsion or air must not send a mixture above 15 ppm overboard.

Oil content is determined by the ISO 9377-2:2000 method (Part 4). Samples are extracted on the day of collection and sealed in the presence of a representative of the national authority. Samples kept between 2°C and 6°C are analysed within seven days at an approved laboratory (1.2.13).

Passing the tests does not mean any detergent can go into the bilges. Paragraph 1.1.3 notes that cleansing agents, emulsifiers, solvents and surfactants may emulsify bilge water. It asks for measures to minimize these substances in the bilges.

The supply pump has a ceiling. Its capacity must not exceed 110% of the separator’s rated capacity, and the size of pump and motor is stated on the certificate of type approval (6.1.2). As a hypothetical example, a separator rated at 5 m3/h has a supply pump ceiling of 5.5 m3/h. A pump replacement has to be matched against this figure on the certificate.

The alarm has 5 seconds and the discharge stop has 20

The two figures measure different stretches.

Stretch Limit Source
From a change in the sample to the correct ppm display 5 seconds 4.2.6
From effluent exceeding 15 ppm to the overboard discharge being prevented 20 seconds (as short as possible) 6.2.1

The 20 seconds include the alarm’s response time. If the alarm uses all of its 5 seconds, 15 seconds remain for the sample line and the automatic stopping device. So the layout of the installation decides this time. The sample line has to deliver a truly representative sample with adequate pressure and flow (6.2.2).

The alarm is pre-set by the manufacturer to activate above 15 ppm. It must also operate automatically if the unit fails, requires a warm-up period or is otherwise de-energized (4.2.7). Accuracy is ±5 ppm. That limit has to hold despite contaminants other than oil and with the power supply varying by 10% from the design value (2.2.1 of Part 2).

The type approval tests push on each of these promises in turn.

Test Conditions Source
Calibration Test Fluids A, B and C at 0, 15 ppm and full scale, 15 minutes each 2.2.5
Contaminant and colour Iron oxide at 10, 50 and 100 ppm, water with 6% common salt 2.2.6
Sample pressure or flow Half normal, normal, twice normal 2.2.7
Shut off Supply shut off, restarted after 8 hours 2.2.8
Calibration and zero drift 15 ppm sample for 8 hours, grab samples at 0, 2, 4, 6 and 8 hours 2.2.10

The electrical and electronic sections go through environmental tests as well. These include vibration, temperatures of 0°C and 55°C, humidity at 55°C with 90% relative humidity, and inclination up to 22.5 degrees in any plane (Part 3).

The alarm itself has to be built against manipulation

Paragraph 4.2.10 adds two items to avoid wilful manipulation. First, access to the alarm beyond the routine checks of 4.2.8 requires breaking a seal. The second is this phrase.

always activated whenever clean water is used for cleaning or zeroing purposes

If clean water is used for cleaning or zeroing, the alarm has to sound. The construction itself closes off the route of feeding the alarm clean water to obtain a low reading.

Calibration on board should not be necessary. Onboard testing according to the manufacturer’s instructions is permitted (4.2.5). A simple means of checking drift, repeatability and re-zeroing is recommended (4.2.8).

The installation follows the same thinking. The re-circulating facility exists to test the separator, alarm and automatic stopping device with the overboard discharge closed. It must not allow a by-pass of the separator under any operating condition (6.1.1). A sampling point goes in a vertical section of the effluent piping close to the separator outlet (6.1.1).

The alarm has to produce 18 months of records

Paragraph 4.2.9 asks for date, time, alarm status and the operating status of the separator. Data is stored for at least 18 months. It must be possible to display or print a protocol for official inspections. If the alarm is replaced, the recorded data must remain available on board for 18 months.

The European Paris MoU instruction for PSC officers (PSCC Instruction 59/2026/06) shows how the record gets used. For MEPC.107(49) equipment, the officer may ask for an extract of the system operation history. It is then compared with the matching Oil Record Book entries. That is a Paris MoU procedure, and procedures elsewhere are checked in the MOU’s own documents.

Here is a hypothetical case. A ship’s Oil Record Book says the separator ran for 2 hours on a given day and discharged overboard. The alarm record shows no separator operation at that time. The two records disagree, so an explanation is needed. If the alarm was replaced and the old data was not carried across, there is nothing left to compare. This is where the replacement sentence in 4.2.9 bites.

Five documents have to stay on board

Document What the Guidelines ask Source
Copy of separator type approval certificate On board at all times, stating main particulars and limiting conditions 5.2.1, Appendix 1
Alarm type approval certificate Issued and retained on board 5.2.2, Appendix 2
Operating and Maintenance manuals A copy on board at all times, for both separator and alarm 6.1.4, 6.2.3
Alarm calibration certificate Certifies the date of the last calibration check, retained for inspection 4.2.11
Maintenance records All routine and repair maintenance recorded 1.1.6

The separator carries a permanently attached plate with any operational or installation limits (6.1.3). Ship staff training includes familiarization in operating and maintaining the equipment (1.1.5).

The accuracy of the alarm is checked at IOPP Certificate renewal surveys according to the manufacturer’s instructions. The alternative is replacing the unit with a calibrated alarm. Only the manufacturer or persons it has authorized may do the check (4.2.11). Crew without that authorization cannot do it.

What to confirm

Paragraph 4.2.11 here follows the original text of MEPC.107(49). Paris MoU PSCC Instruction 59/2026/06 says this paragraph was amended by MEPC.285(70), and lists accuracy checks at IOPP annual, intermediate and renewal surveys as a point to verify. This article did not cover the text of MEPC.285(70). The timing of accuracy checks is to be confirmed in the current amendment and the flag State’s requirements.

This article also did not cover the detailed standards for equipment approved under A.393(X) and MEPC.60(33), or add-on equipment for existing units. The Guidelines are mostly written with should. Their binding force comes through regulation 14, which has the Administration approve the design with regard to this specification. Actual conditions of use are read from the limiting conditions on each certificate of type approval.

You can consult the cited source documents

These links lead to the official publishers of the documents discussed here. Match the edition and provisions cited in the article, and check subsequent amendments and flag-state implementation before applying them.

Bellbook keeps each machine's maintenance interval and completion records in one place

Paragraph 1.1.6 of the Guidelines asks for routine and repair maintenance to be recorded. Bellbook's PMS holds an equipment tree per ship and shows the maintenance interval and next due date. A breakdown repair is also linked to a registered job and stays as a completion record.