What a PSC officer checks under MARPOL Annex VI, in what order, and the grounds for detention (Paris MoU PSCC 58/2025/16)

Each Annex VI regulation has its own article elsewhere. This one looks at the order. What does a port State control officer (PSCO) look at under Annex VI, and in what sequence, from before boarding to the decision on detention?
The source is the Paris MoU PSCC Instruction 58/2025/16 (Guidelines on MARPOL Annex VI, 13 pages). It is guidance for PSCOs. Paragraph 1.2 describes itself as advice to the PSCO, and both the list of clear grounds and the list of detention grounds say they are not exhaustive. The lists in this article are therefore not a ceiling on what a PSCO may look at.
Scope: PSC inspections in ports of Paris MoU member Authorities. According to paragraph 1.4, Annex VI certification applies to ships of 400 GT and over, and fuel oil consumption reporting and CII documentation to ships of 5,000 GT and over. Sulphur requirements apply to every ship regardless of size.
Before boarding the PSCO checks tonnage, build date and ECA movements
Paragraph 2.1.1 lists three pre-boarding steps.
- Gross tonnage and date of construction. These decide which Annex VI regulations apply to the ship.
- Whether the ship entered, transited or is leaving an emission control area (ECA) on its way to the port, and whether the port regulates VOC emissions.
- If the ship is known to use an alternative such as an exhaust gas cleaning system or an alternative fuel, the exemptions and equivalents recorded in the IMO database.
Paragraph 1.4 notes that ECAs differ for NOx (regulation 13) and SOx (regulation 14). The same port has to be checked separately as a NOx Tier III area and as a SOx area. The same paragraph tells the PSCO to take specific care over the ship’s previous, current and next port locations. That is a caution for the PSCO, not an obligation on the ship. Still, if the PSCO will ask in that order, the ship is better prepared if the crew can explain which area each of the three ports lies in.
The floor for document checks is Annex 10 of the Memorandum and the point is consistency
Paragraph 2.1.2 tells the PSCO to examine, as a minimum, the documents in Annex 10 of the Memorandum at an initial inspection. The Annex VI part of Annex 10 is items .54 to .64. These are the IAPP Certificate, the fuel oil change-over logbook, the incinerator type approval certificate, BDNs, the IEE Certificate, the SEEMP, the EEDI Technical File, the Statement of Compliance for fuel oil consumption reporting, the EIAPP Certificate, the Technical Files and the Record Book of Engine Parameters. Paragraph 1.6 of the guidance adds items such as exemption approvals, the ODS Record Book, the NOx Tier on/off logbook and the VOC Management Plan, for 18 items in all.
The same paragraph asks the PSCO to check consistency between documents as well as carriage. These are the pairs the guidance actually compares.
| Value in this document | Compared with | Paragraph |
|---|---|---|
| Sulphur content on the BDN | Fuel sulphur level in the IAPP supplement | 2.3 .10 |
| Time and position in changeover records | ECA boundary | 2.2.2, 2.3 .11 |
| Quantity of compliant fuel bunkered | The ship’s voyage plan | 2.3 .13 |
| NOx Tier and on/off records | Entry into and exit from a NOx Tier III area | 2.2.1 |
| The engines as installed | EIAPP Certificate and supplement, Technical File | 2.4.2 |
| ODS equipment on board | IAPP supplement | 2.3 .7, 2.4.1 |
| Annual CII rating (D for 3 consecutive years, or E) | Corrective action plan in the SEEMP, approved | 2.2.6, 2.3 .18 |
For a ship that changes fuel to meet ECA requirements, paragraph 2.2.2 says three things should be available.
- Evidence that fuel of not more than 0.10% m/m sulphur was delivered and used. This means BDNs and the bunkering records in Oil Record Book Part I.
- A written fuel changeover procedure in a language the crew understands.
- The changeover logbook. It records the volume of low sulphur fuel in each tank and the date, time and position when changeover was completed before entering the ECA or started after leaving it.
A claim that fuel was unavailable needs a record of the attempts
Paragraph 2.2.5 says BDNs are kept for 3 years after bunkering and representative samples for at least 12 months or until the fuel is consumed, whichever is longer. If a ship could not buy compliant fuel, it notifies the flag State and the authority of the port of destination (regulation VI/18.2.4). The PSCO may receive that notification.
The ship is not required to deviate or unduly delay its voyage to obtain compliant fuel. Instead the master or owner must produce evidence of the following.
- Attempts to buy compliant fuel in line with the voyage plan
- If the fuel was not available where expected, attempts to find other sources
- That despite these efforts no compliant fuel was available for purchase
The guidance says investigating other sources before the voyage also counts as part of this effort. Price is not accepted as a reason.
The cost of compliant fuel is not considered to be a valid basis
This sentence is from paragraph 2.2.5 (page 7). It goes on to say this is not a basis for claiming non-availability. If the BDN shows compliant fuel but the ship’s own independent test of its sample shows non-compliance, the master may notify the flag Administration and send copies to the port of destination authority, the Administration where the supplier is located and the supplier. The guidance tells the PSCO to consider all circumstances and evidence, and to accept the situation if the evidence is suitable and the non-compliance is not the ship’s fault.
The on-site check is a comparison with drawings and a sample from the designated point
On the walk-round in paragraph 2.2.7 a PSCO may meet unfamiliar decarbonisation equipment or modifications. In case of doubt the guidance encourages the PSCO to consult drawings or supporting documents on board and confirm that what is fitted matches them.
A fuel sample to verify sulphur content is taken at the ship’s approved designated sampling point. Footnote 3 says the sampling point requirement entered into force on 2022-04-01 and applies to existing ships from the first IAPP renewal after 2023-04-01. A ship with an exhaust gas cleaning system meets the requirement after combustion, so the guidance says there is little benefit in sampling its fuel.
The 18 clear grounds fall into six groups
Paragraph 2.3 says that clear grounds from the general impression or observations on board lead to a more detailed inspection. The list has 18 items and carries the qualifier “include (but are not limited to)”. Grouped by what opens the more detailed inspection, they look like this.
| Group | Items | Content |
|---|---|---|
| Documents | .1, .2 | Annex VI certificates or documents missing or clearly invalid |
| Equipment | .3, .4, .7, .8, .9, .16 | Listed equipment missing or failed, unlisted equipment, ODS, engines, incinerators |
| People | .5, .15 | Crew unfamiliar with or not carrying out air pollution operations, VOC plan not followed |
| Exemptions and equivalents | .6, .12 | Conditions of an exemption or equivalent not met |
| Fuel | .10, .11, .13, .17 | BDN inconsistent with IAPP supplement, non-compliant fuel in an ECA, fuel quantity inconsistent with voyage plan, missing evidence or reports for non-availability |
| Outside information and CII | .14, .18 | Reports or complaints including remote sensing or portable devices, missing CII corrective action plan |
Item .14 is information from outside the ship. If remote SOx sensing or a portable fuel sulphur device indicates non-compliant fuel while under way, that alone can open a more detailed inspection. The item remains even when every document is in order.
The more detailed inspection asks whether people know the procedures
A sentence that recurs in the checklists of paragraphs 2.4 and 2.5 is whether “the Master or crew are familiar with” something. The subjects are ODS emission prevention, engine operation and maintenance under the Technical File, bunkering procedures with BDNs, the Oil Record Book and retained samples, operation and recording of an exhaust gas cleaning system, ECA fuel changeover, the VOC Management Plan, and incinerator operation and screening of prohibited garbage.
Exhaust gas cleaning records carry a specific caution. Paragraph 2.5 .6 says factors such as transient engine operation can create isolated spikes in the record. Even if those values exceed the emission ratio or washwater limits, they should not be taken as evidence that the system was not operated as required overall.
The PSCO also looks at the next voyage. The last paragraph of 2.5 says a shortage of compliant fuel for the coming voyage (without alternative compliance) is to be treated like insufficient garbage space or a lack of sewage storage or treatment.
No Annex VI items are currently listed for an expanded inspection (paragraph 2.6). The guidance says the PSCO uses professional judgement to add items and check the overall condition.
The 8 detention grounds cover certificates, engines, fuel, incinerators, people and CII documents
Paragraph 3.1 lists 8 situations that may warrant detention. This list is not exhaustive either, and it says regulation VI/3 (exceptions and exemptions) is taken into account.
- No valid IAPP Certificate, EIAPP Certificates or Technical Files
- An engine over 130 kW on a ship built on or after 2000-01-01, or majorly converted on or after that date, that does not conform to its Technical File, lacks the required records or does not meet the NOx Tier III area requirements where it operates
- An engine over 5,000 kW and at or above 90 litres per cylinder on a ship built from 1990-01-01 to before 2000-01-01, for which an approved method is available but has not been installed after the first renewal survey
- On a ship without equivalent means, the sulphur content of fuel used or carried for use exceeds the regulation VI/14 limit (a non-availability claim is considered under regulation VI/18.2)
- On a ship with equivalent means, no approval for those means, or fuel above the limit in combustion units not connected to the cleaning system
- An incinerator installed on or after 2000-01-01 that does not comply with Appendix IV of Annex VI or the IMO standard specification
- The master or crew not familiar with essential procedures for operating air pollution prevention equipment
- Missing fuel consumption reporting and CII documentation (Statement of Compliance, IEE Certificate, SEEMP)
The Detention and Action Taken guidance (PSCC 59/2026/03) also refers to a separate guideline for Annex VI detention criteria (2.3.4.11). This guidance is the reference document for Annex VI detention decisions.
A past voyage’s violation goes to a flag State report rather than detention
The last paragraph of 3.1 deals with past emission violations separately. If there is no technical deficiency and no concern for the coming voyage, detention may not be suitable. Instead a report and evidence are sent to the Administration (the flag State) for action under regulation VI/11. Paragraph 4 repeats the point.
The following is a case invented for illustration. A bulk carrier of 30,000 GT arrives at a port inside a SOx ECA.
| Step | What the PSCO saw | Paragraph |
|---|---|---|
| Before boarding | The previous port was outside the ECA and the ship crossed the boundary on this passage | 2.1.1 |
| Documents | The changeover completion position in the logbook is inside the ECA boundary | 2.2.2, 2.3 .11 |
| Detailed inspection | Whether the chief engineer can explain the procedure and the low sulphur fuel in each tank | 2.5 .3 |
| Sample | Fuel in use sampled at the designated point | 2.2.7 |
| Outcome A | Fuel in use or carried for use exceeds the limit | 3.1 .4 |
| Outcome B | Current fuel compliant and enough for the next voyage, only the inbound changeover was late | Last paragraph of 3.1, 4 |
Outcome A is a problem for the next voyage and becomes a candidate ground for detention. Outcome B is a past violation and goes to a flag State report. The same changeover record leads down different paths depending on the fuel on board and the plan for the next voyage.
Worth confirming
This article leaves some things out, either because the Paris MoU guidance checked here does not answer them or because this article did not read the document concerned.
- Detention ground .7 refers to “paragraph 2.4 (Examination of operational procedures)”. In this guidance, however, paragraph 2.4 is titled More Detailed Inspection. The reference may carry an older numbering, so check the latest edition on the Paris MoU site in a real case.
- The details of the fuel sample analysis method (Appendix VI of Annex VI) and how the result is judged.
- The Paris MoU guidance on Electronic Record Books referred to in the text. This article did not check that document.
- Fuel consumption reporting and CII when a ship changes flag during the year. The guidance only says there are specific considerations.
Paragraph 1.1 says decarbonisation is driving frequent and major updates to Annex VI, and that more changes are expected after publication.
You can consult the cited source documents
These links lead to the official publishers of the documents discussed here. Match the edition and provisions cited in the article, and check subsequent amendments and flag-state implementation before applying them.
Continue with the related operational guidance
The PSCO compares the sulphur on the BDN with the IAPP supplement and the quantity bunkered with the voyage plan. The Bellbook bunker delivery note screen takes the delivery date, port, supplier, product name, quantity, density, sulphur and flash point for each bunkering and attaches a photo or PDF copy. The office opens that original from the IMO DCS screen.
Start for freeRelated reading
- PSC inspections of ships carrying industrial personnel, application, headcount, training records and detention grounds (Paris MoU PSCC 57/2024/06)Crew and labour
- How Paris MoU PSCOs match seafarer certificates, flag State endorsements and the minimum safe manning document (PSCC 57/2024/05)Crew and labour
- Paris MoU load line inspections, matching documents, closing devices and marks, and when overloading leads to detention (PSCC 58/2025/12)Inspections and audits