Deficiency and detention items in the Tokyo MOU 2025 ballast water CIC report and what a ship should check

The Paris MoU and Tokyo MOU jointly carried out a Concentrated Inspection Campaign (CIC) on the Ballast Water Management Convention (BWMC) from 1 September to 30 November 2025. The Tokyo MOU published the results for its Member Authorities in a report dated October 2026. Every figure in this article comes from that report.
Scope: the report covers three months of PSC results in the Tokyo MOU region. It does not contain results from the Paris MoU region and it is not a worldwide statistic.
The report counts detentions in four different ways
According to the report, 8,517 ships received 9,244 inspections in the period. Of these, 6,930 included the CIC questionnaire and 2,314 did not. The questionnaire has 10 questions. At least one CIC topic deficiency was recorded in 1,239 questionnaire inspections (17.88%), with 1,577 deficiency records in all.
The detention figure depends on what is counted (Table 2). The report’s headline figure is 30.
| Basis, within the 6,930 questionnaire inspections | Detentions |
|---|---|
| All detentions | 184 |
| Detentions with a BWM deficiency also recorded | 94 |
| Detentions with a BWM deficiency recorded as a ground | 30 |
| Detentions marked as a ground on a questionnaire item | 20 |
The 30 are 0.43% of the 6,930. Separately, 4 detentions on BWM grounds came from inspections without a questionnaire. The report keeps these 4 out of the 30 (paragraph 1.4.2).
The question with the lowest Yes rate is not the one with the most Nos
This is a shortened Table 1. The detention column is the number marked as a ground on the questionnaire. IBWMC is the International Ballast Water Management Certificate, BWMP the Ballast Water Management Plan, and BWMS the Ballast Water Management System.
| Item | Subject | Yes | No | N/A | Detained |
|---|---|---|---|---|---|
| 1 | Valid IBWMC on board | 97.56% | 14 | 153 | 2 |
| 2 | Approved BWMP on board | 97.99% | 25 | 112 | 2 |
| 3 | BWMP reflects applicable requirements | 95.34% | 207 | 115 | 1 |
| 4 | Officers and crew know their BWMP duties | 94.75% | 243 | 117 | 4 |
| 5 | BWMS approval | 97.66% | 38 | 123 | 1 |
| 6 | BWMS operational | 95.22% | 188 | 132 | 11 |
| 7 | Ballast water managed according to BWMP | 97.71% | 36 | 123 | 0 |
| 8 | Ballast Water Record Book (BWRB) entries | 89.41% | 575 | 159 | 0 |
| 9 | Sediments managed according to BWMP | 87.73% | 31 | 819 | 0 |
| 10 | Exemption conditions implemented | 10.72% | 2 | 6,185 | 0 |
Question 9 has the lowest Yes rate among questions 1 to 9, at 87.73%. But it has only 31 Nos, and the rest is 819 N/A answers. The question with the most Nos is question 8, with 575 (8.30%). The Yes rate alone hides that difference.
Record book deficiencies are the largest count and were never recorded as a detention ground
Table 3 counts by deficiency code. The figure before the brackets is for questionnaire inspections, and the figure inside is for inspections without one.
| Code | Basis | Inspections with this deficiency | Inspections with it as a detention ground |
|---|---|---|---|
| 14802 | Reg. B-2, A-4.4 | 615 (31) | 0 (0) |
| 14801 | Reg. B-1 | 266 (21) | 4 (2) |
| 14806 | Reg. B-6 | 265 (15) | 4 (0) |
| 14811 | Reg. D-2 / BWMS Code 4 | 255 (24) | 18 (1) |
| 14812 | Reg. D-3 / BWMS Code 4 | 42 (4) | 2 (1) |
| 14813 | Reg. B-1 | 38 (3) | 1 (0) |
| 14805 | Reg. B-5 | 33 (1) | 0 (0) |
| 01136 | Reg. E-2 | 30 (4) | 2 (0) |
| 14809 | Reg. A-4 | 2 (0) | 0 (0) |
Record book code 14802 appeared in 646 inspections across the two groups (paragraph 2.2.2). As a detention ground it stands at 0. Questions 7 and 8 carry no asterisk, and the detention box is blocked out on the form (the annexed form). That said, no asterisk does not rule out detention. One detention related to question 7, and the form had no box for recording it (paragraph 1.4.2).
Detention grounds concentrated on code 14811, BWMS operation
In paragraph 2.1.3 the report says this about 14811.
the operation and maintenance of BWMS onboard remains a critical area
Code 14811 was recorded in 279 inspections and led to 19 detentions (paragraph 2.2.2, including inspections without a questionnaire). Within questionnaire inspections, it accounts for 18 entries against the 30 detention cases. Question 6 itself shows 11 detentions. The report separately notes 9 inspection reports where a deficiency led to detention but was not marked on the form.
Next comes code 14801 on the approved BWMP. It was recorded in 287 inspections, with 6 detentions (paragraph 2.2.2). The report’s conclusion is that certificates and plans are mostly in place, and that the shortfall lies in system functionality and crew competence (paragraph 2.3.1).
Detention rates ran higher for HRS and for older age bands
The figures below are for questionnaire inspections (Tables 4 and 6). Age is calculated from the keel laid date to the inspection date.
| Risk profile | Questionnaire inspections | Inspections with a deficiency | Deficiency records | Detentions | Detention rate |
|---|---|---|---|---|---|
| HRS | 2,711 | 625 (23.05%) | 803 | 26 | 0.96% |
| SRS | 3,215 | 507 (15.77%) | 635 | 4 | 0.12% |
| LRS | 1,004 | 107 (10.66%) | 139 | 0 | 0.00% |
| Age | Questionnaire inspections | Detentions | Detention rate |
|---|---|---|---|
| 0 to 6 years | 1,132 | 1 | 0.09% |
| 7 to 12 years | 1,366 | 1 | 0.07% |
| 13 to 18 years | 2,414 | 6 | 0.25% |
| 19 to 24 years | 1,353 | 10 | 0.74% |
| 25 to 30 years | 530 | 7 | 1.32% |
| 31 to 35 years | 87 | 5 | 5.75% |
| Over 35 years | 48 | 0 | 0.00% |
By ship type, Table 5 shows general cargo and multipurpose ships at 13 detentions in 1,052 questionnaire inspections (1.24%). Oil tankers stand at 5 in 365 (1.37%) and bulk carriers at 4 in 2,825 (0.14%). Gas carriers stand at 3 in 216 (1.39%), oil and chemical tankers at 3 in 491 (0.61%), and container ships at 1 in 1,436 (0.07%). The order by count and the order by rate differ, so read the two together. In a cell with few inspections, such as the 31 to 35 year band, a handful of detentions moves the rate a long way.
The report itself does not take the 743 exemption answers at face value
Question 10 asks whether exemption conditions are implemented where an exemption has been granted. There are 743 Yes answers. Yet according to the report, 697 of those ships are also recorded as fitted with a BWMS. IMO GISIS shows 70 ships with a Reg. A-4 exemption, and none of them was inspected under the CIC (paragraph 2.2.4).
The report offers two possibilities. PSCOs may have misunderstood the question, or Administrations may not be reporting exemptions to GISIS. A ship with an exemption should keep in mind that question 8 also looks for the exemption in the BWRB.
A ship can check six things by following the questionnaire
The table below is drawn from the report’s questions and recommendations.
| What to check | Item | What the report points to |
|---|---|---|
| Does the BWMS actually work | 6 | Code 14811, where detention grounds concentrated |
| Has the crew learned operation, fault diagnosis and emergency procedures on this equipment | 4, 6 | The hands-on training recommendation in paragraph 2.3.1 |
| Are there preventive maintenance schedules and performance tracking records | 6 | The recommendation in paragraph 2.3.1 |
| Is an approved BWMP on board and does it reflect applicable requirements | 2, 3 | 207 Nos on question 3 |
| Is the BWRB properly filled in | 8 | 575 Nos, and exemption entries if any |
| Certificate, BWMS approval, ballast water and sediment management | 1, 5, 7, 9 | Questions 1, 5 and 9 carry an asterisk |
Worth confirming
In places the report’s text and its tables disagree. This article uses the table figures.
- Paragraph 2.2.5 says SRS ships had the largest portion of deficiencies, but Table 4 shows 803 deficiency records for HRS and 635 for SRS.
- Paragraph 2.2.5 names general cargo ships and bulk carriers as the largest portion of detentions, but Table 5 shows 5 for oil tankers and 4 for bulk carriers.
Some things are also not covered by this article.
- Ballast water treatment performance. No ballast water sample was tested in this CIC (paragraph 2.2.7). A Yes in the report does not mean the D-2 performance standard was measured.
- Results from the Paris MoU region.
- The content of the PSCO guidance. The report says only that guidance was provided (paragraph 1.3.3).
The report expects the Experience-Building Phase (EBP) to run until 2026 and a full revision of the Convention to be completed by 2028. These are expectations, so confirm the actual schedule in IMO documents.
You can consult the cited source documents
These links lead to the official publishers of the documents discussed here. Match the edition and provisions cited in the article, and check subsequent amendments and flag-state implementation before applying them.
Continue with the related operational guidance
In this report the detention grounds concentrate on whether the system works. The Bellbook nonconformity screen registers findings from a PSC code list that includes BWM codes, and with the BWMS added to the PMS as equipment, maintenance intervals and completion records stay on file per ship.
Start for freeRelated reading
- BWMS Code type approval tests, System Design Limitations and 24-month self-monitoring records (MEPC.300(72))Environment and regulation
- Crude oil washing (COW) PSC checks and how the Operations and Equipment Manual is matched against Oil Record Book Part II (Paris MoU PSCC 59/2026/09)Environment and regulation
- Evidence PSC gathers in a MARPOL discharge violation investigation and the records a ship should keep (Paris MoU PSCC 59/2026/10)Environment and regulation