Skip to content
PSC · Tokyo MOU

Tokyo MOU criteria for RO responsibility in a detention and the PSCO code of conduct

When a detention occurs in the Tokyo MOU region, one more question is asked. Can the deficiency be treated as something the RO missed at survey? The test is in a three-page document, Criteria for attribution of RO responsibility. RO here means a Recognized Organization or other private body that surveys ships and issues or endorses statutory certificates on behalf of a flag State (paragraph 1).

How a PSCO should behave is set by the Code of Good Practice. The two documents meet at the detention itself. When a master explains the timing of a deficiency and disagrees with a finding, the first shows what the issue is and the second shows how the PSCO should respond.

Scope: both documents apply to PSC under the Tokyo MOU. Criteria in other regional MOUs have to be checked separately.

A deficiency that is not a ground for detention is not assessed

The RO responsibility is assessed only relating to detainable deficiencies

That opens paragraph 2. Only detainable deficiencies are looked at, and two further conditions apply. The deficiency has to be covered by a statutory certificate the RO issued or endorsed with a date of survey. The RO also has to have carried out the last survey or verification audit for that certificate.

The table in paragraph 2 sets this out by issuer and last annual or intermediate surveyor.

Certificate issued by Last annual or intermediate survey by Can RO responsibility be assigned?
Flag None No
Flag Flag No
Flag RO Yes
RO None Yes
RO Flag No
RO RO Yes

The table looks at who saw the ship last. If the RO issued the certificate but the flag carried out the last survey, there is no RO responsibility. If the flag issued it and the RO carried out the last survey, responsibility can be assigned.

Each deficiency type has its own timing test

Paragraph 3 lists eight cases in which a deficiency is associated with the RO. The core question is whether the deficiency existed at the last survey, and that test changes from case to case.

Para. 3 Deficiency Timing test
(i) Serious structural (corrosion, wastage, cracking, buckling) No day limit. Excluded if clearly arising since the last survey
(ii) Serious, equipment or non-structural fittings Under 90 days since the last RO survey. Excluded if clearly arising since
(iii) Serious, equipment or non-structural fittings Whatever the days, it clearly would have existed at the last survey
(iv) Out-of-date equipment Already out of date at the last survey
(v) Missing approval or endorsement of plans and manuals Clearly would have existed at the last survey
(vi) ISM major non-conformity Clear evidence of lack of implementation, clear evidence it existed at the last audit, audit within 90 days
(vii) Detainable MLC deficiency Clear evidence of lack of implementation, and that it existed at the last inspection. No day limit
(viii) Certificate issued or extended against convention limits No timing test

Three things follow.

  • For structure the default points to the RO. Corrosion or cracking drops out only if it clearly arose after the last survey.
  • For equipment 90 days is the line. Under 90 days it points to the RO, and after that it has to be clear the deficiency existed then.
  • ISM has the heaviest conditions. Case (vi) does not reach an audit more than 90 days old. The same item says it may include operational drills and operational control, with clear supporting evidence of failure.

Three cases do not go to the RO

Paragraph 4 sets out when a detainable deficiency is not associated with the RO.

  • It is the result of accidental or voyage damage.
  • It is missing equipment likely to have been stolen. The PSCO should seek evidence of follow-up by the master. The document’s examples are an order for replacement equipment and contact with the flag State asking for a condition.
  • It is an expired certificate, unless the RO improperly issued the certificate after a survey on behalf of the flag State.

For theft the ship’s paperwork is clear. The record of the day the loss was found, the order, and the exchange with the flag State are the evidence.

The same deficiency is judged differently by date

This case is hypothetical. The RO issued the certificate and carried out the last annual survey on 2026-03-10. Take two detention dates. 2026-06-05 is day 87 and 2026-06-20 is day 102.

Detainable deficiency Day 87 Day 102
Serious defect in the fire main (ii) Associated, unless clearly arising since Only (iii) is left. Must clearly have existed then
Severe corrosion in deck structure (i) Associated (i) Associated, regardless of days
Equipment already out of date before the survey (iv) Associated (iv) Associated
Contact damage suffered on the voyage Not the RO, paragraph 4 (i) Not the RO, paragraph 4 (i)

An ISM major non-conformity is counted from the last audit date instead. If that audit was 102 days ago, (vi) does not apply.

This table shows the route of the decision. The real decision is the PSCO’s, on the evidence of the day. The timing discussion can only start if the date and surveyor of the last survey, and the day the deficiency was first known, can be shown from certificates and records.

The flowchart and the text do not fully match

The flowchart on page 3 draws the text, but not exactly.

  • The flowchart is numbered 2.3, 2.4 and 2.5, while the text paragraphs are 2, 3 and 4.
  • The ISM audit period is 90 days in the text and 3 months in the flowchart.
  • The flowchart’s theft item says a large quantity of missing equipment and makes the master’s follow-up a condition. The text says nothing about quantity.
  • If the last surveyor is not the RO, the flowchart goes straight to no responsibility. The table in paragraph 2 answers yes where the RO issued the certificate and no survey has followed.
  • The flowchart has no item for paragraph 3 (viii).

The flowchart does add the order. The three exclusions of paragraph 4 are asked first, and paragraph 3 comes after.

The Code of Good Practice has three principles and 28 items

The Code of Good Practice judges PSCO actions by three principles: integrity, professionalism and transparency. Annex 1 has 28 items. It is written with should, and nothing in it relieves a PSCO of the Tokyo MOU guidelines or national law. The items a ship can look to during an inspection are these.

Moment Items What the PSCO should do
Boarding 10, 11 Follow the ship’s security rules and wait for an escort. Show identity card at the start
Reason for inspection 12 Explain the reason, but not reveal who made a report or complaint
Testing 15 Ask the crew to demonstrate equipment and drills, and not test personally
Uncertainty 16 Consult colleagues, publications, the flag or the RO, not decide uninformed
Operations 17 Accommodate the port’s and ship’s operational needs where safe
Results 18, 19 Explain findings and corrective action clearly. Issue a legible report before leaving
Disagreement 20, 21 Deal with it calmly. Advise the complaints procedure if not resolved in reasonable time
Detention 22 Advise the master of the Tokyo MOU appeal procedure and the national right of appeal
Impartiality 23, 24 Have no commercial interest in the ports, ships or related companies, and decide on findings only
Gifts 25, 26 Follow the rules on gifts, refuse bribery and report it

Item 16 touches the RO question. A PSCO who is unsure of a requirement or finding may ask the RO. Paragraph 3.7 of the Memorandum has the Authority notify the flag State of a detention, and also advise the certifying body if it is not a maritime administration.

This does not run one way only. Item 8 says PSCOs should expect to be treated with courtesy and respect. The examples in item 25 include meals on board.

Worth confirming

Both documents are short. What this article leaves out is what they do not answer.

  • Who confirms the RO decision and at what stage, and whether the company or RO can contest it.
  • How an RO decision enters RO performance. Annex 2 of the Memorandum only says RO performance takes account of the inspection and detention history of the preceding three calendar years.
  • The tests for a serious deficiency or a major non-conformity.
  • When the two documents were last revised. Neither states an edition or effective date.

There is one example of the result appearing in statistics. Table 3 of the Tokyo MOU report on the 2025 ballast water CIC counts 30 inspections with the CIC questionnaire where a topic-related deficiency was a ground for detention, and 2 of them as RO-related. The report does not give the reasons for individual decisions.

You can consult the cited source documents

These links lead to the official publishers of the documents discussed here. Match the edition and provisions cited in the article, and check subsequent amendments and flag-state implementation before applying them.

Bellbook keeps the issuing body and each annual and intermediate survey date on every certificate

RO responsibility starts from who issued the certificate and when the last survey was. Bellbook ship certificates hold the issuing body and build a history of annual and intermediate survey dates by type, so those dates are at hand on the day a detainable deficiency appears.

Start for free

Related reading

← Back to the blog