The Hardware, Process and Human axes of a SIRE 2.0 negative observation and the SOC and NOC classification

A problem the inspector finds in a SIRE 2.0 inspection is recorded in a fixed form. Page 2 of the OCIMF Negative Observation Module explanation opens with this first sentence.
Any deficiency, defect or non-compliance identified during a SIRE 2.0 inspection must be recorded
An item recorded this way is a negative observation. The explanation sets the recording method so that report data can be analysed systematically. This article reads that structure. It looks first at the fields of one observation, then at the axes, and ends with how the operator answers.
Scope: The classification in this article works inside the OCIMF SIRE 2.0 Programme. It is not the classification of PSC deficiency codes or of ISM audit findings. The sources are the explanation, version 1.0 (April 2022), and the vessel operator process document, version 1.0 (March 2023). Page numbers are printed page numbers. The full code tables are in the annexes of the original and are not copied here.
One negative observation is made of three fields
Pages 2 and 3 of the explanation set the recording order in three steps.
| Order | Field | Question it answers | How it is entered |
|---|---|---|---|
| 1 | SOC (Subject of Concern) | What is being reported on? | Selected from a set code or list |
| 2 | NOC (Nature of Concern) | What has been observed? | Selected from the list for the axis |
| 3 | Negative comment | What is the actual condition? | Written as text amplifying the codes |
The first two fields are codes and only the last is text. The codes let many reports be gathered and analysed, and the text tells the reader the condition of that ship.
There are three axes, plus photograph comparison
What SOC and NOC point to differs by axis.
| Axis | What is selected as SOC | SOC source | NOC source |
|---|---|---|---|
| Hardware | The deficient structure, machinery, outfitting or equipment | Annex 1 | Annex 5 cause analysis list |
| Process | The deficient procedure or document | Annex 2 | Annex 6 cause analysis list |
| Human | The rank grouping of the person or team observed | Annex 3 | Annex 7 PIFs |
| Photograph Comparison | The location of the standard photograph | Annex 4 | Annex 8 cause analysis list |
The SOC lists have different roots.
- Hardware is the standard classification coding the industry uses in planned maintenance and purchasing systems (page 7). It has three levels, and the SOC is one of the Level 3 descriptions.
- Process is coding built for SIRE 2.0 from TMSA KPIs and BPG (page 10). The aim is to link SIRE 2.0 observations with TMSA KPIs for analysis. The SOC is selected at the appropriate Level 2, 3 or 4. Item 4B (Machinery Space Management) was constructed for SIRE 2.0 and is not in TMSA3.
- Human does not single the person out. Annex 3 records only the seniority of the Observed Person (OP) without giving the actual rank (page 22). The actual rank goes neither in the SOC nor in the comment.
One scene splits into three observations
The explanation uses a deck foam fire-fighting system as its example (page 2, pages 4 to 6). The inspector sees three things. An isolating valve is seized open. The PMS includes the system but has no inspection or maintenance task for that valve. The accompanying officer does not know the location and purpose of the valve.
| Axis | SOC | NOC | Gist of the negative comment |
|---|---|---|---|
| Hardware | The foam fire-fighting system | No maintenance task exists | The valve is seized |
| Process | Planned tasks and records item 4.1.1.3 |
Procedure accuracy | The PMS has no task for the valve |
| Human | The relevant rank grouping | PIF 1 and 3 |
The person does not know the valve |
The wording in the table condenses the original. The row to look at is Hardware. The fact that the valve is seized goes in the comment, and the NOC takes the cause side, that no maintenance task existed. The condition of the equipment and the path that led to it are written in different fields.
The NOC lists fix the branches of cause
The option wording is in the original. Here we look only at the branches.
Hardware (page 25) divides by the maintenance system. A maintenance task exists but was not done or the records do not fit what is seen, no task exists at all, the task was deferred, the task is up to date and the failure was sudden, or something else. The sudden failure branch carries the premise that a maintenance task exists and is up to date. If the PMS record is empty, that branch has nothing to support it.
Process (page 26) divides by the state of the procedure. A procedure is absent or out of reach, procedures conflict, the content has a problem of clarity, accuracy, realism or completeness, updates were not communicated, or something else.
Human (page 27) is the Performance Influencing Factors (PIF). There are 10 numbered items. Items 1 to 9 are the factors, covering subjects such as recognition of safety criticality, fatigue and time pressure, and the workplace environment. Item 10 is Not Identified. Page 2 of the explanation says one or more PIFs are identified. The annex images likewise draw Hardware and Process as single-choice buttons and the PIFs as tick boxes.
Photograph Comparison (page 28) divides by how the photograph differs from the actual condition. It looks at whether the area shown was recently upgraded and whether the photograph fails to represent the overall condition.
The Human axis is recorded beyond negative responses
Page 2 of the explanation has two notes on the Human Response Tool. The rank grouping is required for all responses, not only negative ones. A PIF and a supporting comment are required not only for negative responses but also for Exceeded Normal Expectation and Largely as Expected responses.
So the record on the Human axis is wider than the list of findings. Rank groupings and PIFs remain against responses that are not negative as well.
The operator answers each observation in four fields
Once the Submitting Company has processed the inspection, the operator receives the draft report. According to page 28 of the operator document, comments in SIRE 2.0 are more structured than the earlier open text. The operator breaks a comment into four responses: immediate cause, root cause, corrective action and preventative action.
The input differs slightly by axis. Hardware, Process and photograph observations are free text. For Human observations the root cause is selected from a multi-select list (page 30). Supporting documents can be attached to each observation, and a general comment on the whole report can be added separately.
To answer the Hardware observation on the valve above, the fields would hold something like the following. These are hypothetical answers made up to show the structure, not wording from an OCIMF document.
| Field | Hypothetical answer |
|---|---|
| Immediate cause | The isolating valve seized because it had not been operated for a long time |
| Root cause | The isolating valve was left out of the scope of the foam system maintenance task |
| Corrective action | The valve’s operation was restored and an inspection task was added to the PMS |
| Preventative action | The same system across the fleet is checked against the PMS to find omitted valves |
Comments have a time limit. According to page 33 of the operator document, the operator raises amendments with the Submitting Company outside the system. If this runs past the 14 day automatic publication, the report is published with whatever has been entered following the status update to Submitter validated. If the Submitting Company opens the draft for resubmission, the 14 days begin again. Comments already written are saved then, but the operator has no access to them until the draft comes back.
After publication, comments can still be added and republished (page 31). But an inaccurate report cannot be reopened and corrected, and only withdrawal remains (page 33).
Worth confirming
This article is based on version 1.0 of the explanation and version 1.0 of the operator document. Code tables and options can be revised, so confirm them against the current OCIMF editions. The explanation calls the same screen by two names, Negative Observation Module and Negative Response Module.
Some things are not covered by this article. The full annex code tables are not copied. The two documents do not answer how the number of observations is used in report recipients’ assessments. No criterion is given for when the Other option may be used.
You can consult the cited source documents
These links lead to the official publishers of the documents discussed here. Match the edition and provisions cited in the article, and check subsequent amendments and flag-state implementation before applying them.
- OCIMF · SIRE 2.0 Negative Observation Module Explanation
- OCIMF · SIRE 2.0 Inspection Management Processes - Vessel Operator
Continue with the related operational guidance
The four fields of an operator comment can only be filled from records kept on board and ashore. Bellbook registers a VETTING on the audit screen and carries its findings into the non-conformity register, where root cause, corrective action and handling stage are tracked. SOC and NOC coding and the operator comments themselves are entered in the OCIMF system.
Start for freeRelated reading
- SIRE 2.0 time limits from inspection request to report publication and the conditions for cancellation and withdrawalInspections and audits
- SIRE 2.0 standard photograph set locations, the six-month refresh and how photographs are compared during inspectionInspections and audits
- Who completes the SIRE 2.0 PIQ, when the declaration fixes it and which answers change the question setInspections and audits